September 12-15, 2013
Logbook – September 12, 2013 (Alcatraz to La Gringa)
Passage Log Highlights
- 1425 Depart Alcatraz
- 1646 Arrive La Gringa
Daily Notes
- Issues dropping spinnaker in strong winds. Tim injured toe, rope burns on hands. D-rope burn on foot.
- Alex test lesson 80.
- Apple crumble

Logbook – September 13, 2013 (La Gringa)
Daily Notes
- Boys – pizza, movie, sleepover @ LC
- Dinner on Exodus, talking on the net until 2 AM:-)
Logbook – September 14, 2013 (La Gringa)
Daily Notes
- Boys – after sleepover on LC, capture the flag on the beach then lots of swimming. Alex back in the water after his ear infection
- T/Steve – Dinghy fishing. Yellowtail & Sierra. Sashimi appetizer on LC
- Still have residual no-see-um itching
- B has growing pains
Logbook – September 15, 2013 (La Gringa to BLA Village)
Passage Log Highlights
- 1334 Depart La Gringa
- 1524 Arrive BLA Village
Daily Notes
- Boys cleaned the hulls before leaving La Gringa
- Delay weighing anchor because the windlass cut out mid way. Turned breaker off/on then it came back on but immediately tripped again when activated. Could not get it to work manually. Tim cleaned it, then it worked (electrically).


